The inner-outer cylinder discussion was eliminated in the later version I have.
Pages 12-14 are greatly modified from the earlier version.
The August 2012 Penon Hot-Cat report
-
-
Hi all
Thomas, why do you keep forgetting that the
HIGH TEMPERATURE E-CAT MODULE Test of July 16th, 2012 for E-Cat Certification
Was with a three man test team of:
:Fabio Penon , M.Eng. (Nuclear Engineer, Product Certification Specialist)
E-Cat Electronic Control System Specialist
:Fulvio Fabiani, M.Eng.
Radiation Protection Report:
David Bianchini, M.Sc (Physicist, Radiation Measurements Specialist).was at the behest of IH and paid for by them to their specification, using people they selected and agreed too?
Kind Regards walke
-
Hi all
Thomas, why do you keep forgetting that the
HIGH TEMPERATURE E-CAT MODULE Test of July 16th, 2012 for E-Cat Certification
Was with a three man test team of:
:Fabio Penon , M.Eng. (Nuclear Engineer, Product Certification Specialist)
E-Cat…The August test is a rerun of that as far as I can see. Is there a separate report? If so, please link it.
Want To Advertise or Sponsor Us?
CLICK HERE to contact us.
CLICK HERE to contact us.