Hi all It appears to be Game-over for IH case, as IH's own Exhibit 5 leaks ERV data that along with photographs of the control pumps under operational load provide the data to allow us to confirm a minimum COP of 13.8 from the E-Cat plant. It also busts several of Jed's suppositions I quote from a post Engineer48 made in a further observation he made to his detective work on the pump pressure in another post. […] http://www.e-catworld.com/2016/08/19/analyzing-e-cat-plant-pumps-indicate-cop1-engineer48/ Follow the link to read the article and comments in full. More importantly it means as I suspected IH would selectively leak from the ERV, the tactic has as I suspected now blown up in their face and because IH blinked first, others are now free to publish the ERV. :) Kind Regards walker