    there have been no academic opposition.


    No- but there was plenty of opposition from within the EU bureaucracy. Very few acientists will publicly criticise a grant-funding body at the point of handing out grants. They themselves are dependent on the goodwill of those who hold the purse-strings. Sometimes- after things go very wrong they will criticise but it is rarely you hear of such problems.

  • The manual is available online.

    Borderlands.de photo link http://www.borderlands.de/net_pdf/NET0113S13-15.pdf

    That 'borderlands' link is to the article.

    Here's the full pce-830 manual :
    https://www.pce-instruments.co…lyzer-pce-830_1056470.pdf


    The very last section explains the screen codes.

    I'm still not clear what the suggested error was ... current clamps on wrong line? Reversed polarity?
    I only spotted 4 wires going to the test rack. Should be 7 - V1-3, I1-3, N ?

  • The 4 wires going to the ecat are the correct colours for three phase plus neutral in Italy. There are three wires coming out of each end of the ecat. There are two wire connections coming out of each end of the ecat by combining two of the three leads to one connection.

    I tried to make sense of that and decided it might be possible to operate the easiest wiring interpretation but it would be ugly on the power supply end. Electrically like rolling a semi-circle for a wheel.

    I guess that using 3 phase 3 wire, when there is actually a neutral (so should be 3 phase 4 wire), reads a phase backwards or something. Need one of those PCEs to test out one day. They are getting old enough to start being available used/obsolete for a decent price maybe, but I haven’t seen any around. But anyways I expect the PCE operates in a pretty standard way to whatever input it gets.

  • The manual has examples of 3-phase 3-wire AND 3-phase 4-wire ... but that's for a 1-phase load hanging off one of the wires, which needs N.

    The 'indications' paper has two more shots of the instrument desk-top --- but I still can't see "current" wires OR clamps near the eCat ... which are quite big. Could be hidden by the desk.

    Edit: Fig 12 (right) has a glimpse of the back of the desk. But it's not clear enough to see anything.

  • That's 3 things. Reminds me of Monty Python, Spanish Inquisition:

    :) Yes, it looks similar, but the four things in JR's list are separated by periods, so they seem to be just synonyms or different aspects of one and only one thing, which is later called "moola" (1). In any case, a special emphasis is put on FUNDING, the first thing in the list and the only one in capital letters.


    Consider that in December 2011, when he posted the comment, JR was engaged full steam in convincing the world of the reality of the Ecat. He justified his own belief on the positive opinion of the UniBo professors, who in turns at that time were still hoping to get 500 thousands Euros in FUNDING from Rossi.


    In the same Vortex discussion (2), JR also highlighted the positive impression, which Rossi made on other CF/LENR experts, including a main supporter of the reality the F&P results. The same chain of interests and anecdotal beliefs at works for both couples: F&P and Rossi/Focardi.


    (1) https://www.mail-archive.com/v…@eskimo.com/msg59095.html

    (2) https://www.mail-archive.com/v…@eskimo.com/msg59176.html

  • the positive opinion of the UniBo professors, who in turns at that time were still hoping to get 500 thousands Euros in FUNDING from Rossi.

    I'm curious, on what basis would University of Bologna professors think that in 2011 Rossi had both the intention and the means to give them 500K Euros in funding?

  • ISTR the intention was clear. He was making deals with various sources of funding, so plausible. I think UniBo even commented that a payment was due before any work could start. (This was before lenr-forum ... talked about on vortex, I think.)

    But then the 'nobel' group showed up, and Rossi switched horses.

  • I'm curious, on what basis would University of Bologna professors think that in 2011 Rossi had both the intention and the means to give them 500K Euros in funding?

    Underlines added.


    February 4, 2011 (a few weeks after the January 14 public demo) – From http://22passi.blogspot.com/20…-al-prof-mauro-villa.html :


    22PASSI. So che è in corso il perfezionamento di un contratto di ricerca tra Rossi e l'Università di Bologna per permettere al Dipartimento di Fisica di eseguire ulteriori esperimenti, parteciperà anche lei a questa ricerca?

    VILLA. Certamente, se gli attori principali lo vorranno. Come ho già detto a Rossi e Focardi, ho un laboratorio che è già attrezzato per misure di fisica nucleare: principalmente gamma e neutroni. …


    February 9, 2011 – From http://www.energeticambiente.i…ssi-38.html#post119169549


    … Per questo motivo ritengo che l'ing. Rossi introdurra' nel protocollo di accordo che verra' firmato col dipartimento di fisica una clausola che imporra' la totale riservatezza sulle energie dei gamma osservati, fatta esclusione per i gamma emessi dal rame o dal nichel, onde evitare che si possa ricostruire da esse la natura chimica dell'additivo.

    Con i piu cordiali saluti

    Sergio Focardi


    March 10, 2011 – From http://www.nyteknik.se/nyheter…energi/article3123849.ece


    According to Rossi, Eon was sold for about one million Euros.


    Rossi says the 500,000-Euro investment to develop the E-cat was made through his American company Leonardo Corporation, which prior to the development of the energy catalyzer was a parallel activity to Eon.


    From Leonardo Corporation Rossi is now paying the remaining 500,000 Euros to the Physics Department of Bologna University, following a new agreement under which the university will help Rossi with the continued development of the reactor and studies of its physical phenomena.


    June 19, 2011 – From http://22passi.blogspot.it/201…-ufficiale-sulle-cat.html


    Il Dipartimento di Fisica dell’Alma Mater Studiorum – Università di Bologna desidera comunicare che:


    è stato firmato un contratto di Ricerca con la Ditta EFA srl del valore di € 500.000 (+IVA), della durata di 24 mesi, …


    (in English: http://newenergytimes.com/v2/s…NIBO-NoticeOfContract.pdf )

  • Ascoli65

    Is this old post a better synthesis of your opinion on AR story?


    https://fusionefredda.wordpres…facce-dello-stesso-bluff/

    The post is still valid, but nowadays a better synthesis on CF story should start from F&P and include the two EU projects HERMES and CleanHME.

    As for the AR adventure in CF, the most informed synthesis was provided IMO by Marianne Macy (1).


    (1) http://www.infinite-energy.com…ng-a-lawsuit-in-lenr.html

  • That's where I got it .. zoomed in to the pixel level and couldn't see a current clamp (or a Bigfoot or a Loch Ness Monster ...) Ah well.

    Keep in mind that the March part used a single phase ecat, where the December part is three phase.

    So, for the photos you posted, the amp clamps are visible on the workbench. (Not in those photos)
    For the December test the amp clamps seem to be way up the rack for some reason.

  • If the CT’s were 5 amp output, (not mv), they could have been installed upside down, resulting in odd power quadrant readings.

    Power & Energy would still be accurate,

    But may have a - in front of power factor.

  • Note that Rossi handed over the ecat to the "independent team". He may have been around, he may have helped tehm ... but any/all of them should have double/triple/quadruple checked the system.

    They are all (maybe except Levi) excellent professors and theoretical scientists.

    But NONE of the team are experimental scientists. They did call in help for the IR aspects: they SHOULD have called in a electrical engineer for the power end. (Ditto and likewise for ALL the tests ... RMS etc etc)

    So it's incompetence (and hubris), not fraud.

  • Wow ... I can almost see daylight on my work overload! After Saturday (a radio show) I'm almost free!

    But I don't think I'm going to dig deeper into Rossi history.

    A lot of this re-visiting/re-hashing derived from a question as to why *I* haven't written Rossi off totally.

    And my answer remains -- he's a liar who may have something. The proof has failed, but so much of the work was so sloppy that the dis-proof has failed too.

    I STILL have my name in the domestic unit pre-order list ... and I'll exercise that option!

    See you after the next ... ummmm .... proof! demonstration? whatever ...

  • The last thing to consider, not that anything can be seriously made of it, is that the Professors say they bring their own testing equipment to several tests but Rossi always has the exact same stuff.

  • See you after the next ... ummmm .... proof! demonstration? whatever ...

    This is what I eagerly await. There is, increasingly, less and less room for ambiguity. The demo will presumably involve measuring Ecat SLK electrical output instead of heat measurement, the latter being fraught with all manner of trouble as we know. What could go wrong with simply measuring electrical input and output? 8o

    Go Andrea!

Subscribe to our newsletter

It's sent once a month, you can unsubscribe at anytime!

View archive of previous newsletters

* indicates required

Your email address will be used to send you email newsletters only. See our Privacy Policy for more information.

Our Partners

Supporting researchers for over 20 years
Want to Advertise or Sponsor LENR Forum?
CLICK HERE to contact us.