Somewhat interesting from the report:
"REPORT OF THE EXPERIMENT MADE ON MARCH 7 2017 IN
THE LABORATORY OF THE FACTORY OF LEONARDO CORPORATION
Address of the site: 7861 NW 46th St., Doral, Florida, 33139 USA"
Well, JMP was supposed to be at this address, but now Rossi has officially stated it is Leonardo Corp's "Factory". Another almost bullet proof point that there was no customer for the 1 year test and we now know where Rossi does his experimental work. One would have to believe that JMP moved production into a facility and then vacated it in a very short period of time (1 year) and then Rossi took over the facility. Not likely. I wonder who his "team" is now that Fabiani is in Russia?
Perhpas Mr. Weaver could chime in on what equipment was setup at this location, if he knows of any.
Is it well equipped lab or is it "bare bones bench and voltmeter?"
Mr. Gullstrom seems to be a doctoral student at Uppsalla.
https://katalog.uu.se/empinfo/?id=N9-174
He has been linked with the Lugano testers and Rossi since 2014 per Sifferkol. (Did not think I would ever link to Sifferkol's site! I do not know how accurate it is? I wonder whatever happened to him anyway?)
http://www.sifferkoll.se/siffe…l-oscar-gullstrom-papers/
One thing I must say, Rossi is like the Energizer Bunny.... he keeps on going and going and going. Why he simply does not "really" sell a plant and put into operation if he really has something. He could put this all to rest several different ways.