Hi all
In reply to Jed.
You stated the criteria and I got YOU to state the relevant passage in the rules and instructions for that particular meter. I pointed to the installation instructions and let you correct me.
By doing so you confirmed the criteria and source, not I.
I then used the criteria you stated were needed and applied the rules as you required, and showed that the meter was well within the stated rules for that meter, you keep trying to introduce rules for other types of irrelevant meter which are nothing more than a red herring.
The meter is known, the position is known and proven to be well within the specification you set.
Kind Regards Walker